• March 5, 2024

    Three Phase Meter CL730S23 CT

    CL730S23 TWO BUTTONS

    The CL730S23 CT is a static three-phase revenue meter designed for industrial applications together with current instrument transformer connection.

  • January 8, 2024

    Preventive Measures for Virus Control

    clou party committee

    There is an additional difference between rectal measurement and infrared measurement in the range of 0.03 °C.

  • February 8, 2024

    What is Measurement Uncertainty?

    RS350

    When we do high precision measurements we have to make sure that we are getting the measurement results as accurate as possible.

  • February 4, 2024

    Wrong Phase Sequence

    phase sequence

    The measurement circuit of CLOU three-phase energy meters constantly monitors transition through zero on all phase voltages.