Metering Blog

Here we are publishing answers on your questions related to electrical energy and metering. If you have questions, please use our contact form or write a comment below the related article.
Add us on LinkedIn or with WeChat ID: SZ002121 to stay tuned.

blog qr-code
share this page
WeChat QR
scan in WeChat

The calculators and animations in this blog work with JavaScript-enabled Web browsers.
Please make sure your Web browser is JavaScript-enabled.

Since End of 2020 we are using asynchronous scripting technologies. If you can not see the clocks below working, your browser needs to be updated.

Your System Time
88:8888 8888-88-88 888
Shenzhen Time
88:8888 8888-88-88 888

Selection of Voltage Transformers

Selection of Voltage Transformers

Voltage instrument transformers (VT, sometimes also abbreviated with PT) are used on the primary side of medium- and high voltage distribution transformers. ...
Selection of Current Transformers

Selection of Current Transformers

Transformer operated energy meters need instrument transformers to reduce high voltage- and current values to lower quantities for measurement purpose. ...
Cross-sections for electricity wiring

Cross-sections for electricity wiring

Each conductor wire has a resistance. Resistance means heat development inside the wire. Technically it's a loss. ...
Electrical Power Supply Systems

Electrical Power Supply Systems

Usually the power supply systems are named with single phase, three-phase three wire or three-phase four-wire. The German VDE and the IEC60364-1 have unified the supply systems based on grounding. ...
Maximum Current for Energy Meters

Maximum Current for Energy Meters

An energy meter has certain specifications, including maximum current. This is the base for all kind of meter type tests. ...
The TID Clock is ticking

The TID Clock is ticking

If you are using STS prepayment energy meters you might remember that updates are required for the key management centre (KMC), the security modules and the vending software. ...
Markings on the Case of Energy Meters

Markings on the Case of Energy Meters

The IEC 62052-11 Edition 2 has introduced some changes for the meter marking and documentation. Today we cover the mandatory content of the nameplate for IEC meters. ...
Pairing of a User Interface Unit with a Meter

Pairing of a User Interface Unit with a Meter

A user interface unit (UIU) is a remote access terminal for STS prepayment meters. The device is placed inside the users premisses while the energy meter is mounted outside and mostly not direct accessible. ...
Swapping Phase and Neutral

Swapping Phase and Neutral

Will an electronic energy meter measure accurate when I invert phase and neutral during installation? This question came up recently. ...
Ring Wave Immunity Test

Ring Wave Immunity Test

The IEC 62052-11 Ed.2 comes with a lot of changes for meter type testing. Another new introduced test for electromagnetic compatibility (EMC) is the ring wave immunity test. ...

12 Replies to “Metering Blog”

  1. I have a clou meter token and am just wondering how i can silence the beeping alarm that goes off when your are low on tokens. Its kinda annoying. Ypur help will be highly appreciated.
    Regards,
    Steve

    1. Steve, try code 812 on your UIU (user interface unit) and confirm by pressing the enter-button (blue or red). If it doesn’t work, please tell us the meter model type.

    1. If the energy meter has a function for measuring reactive energy, it must have a test output (a flashing diode) indicating the reactive consumption. This test output has a meter constant, indicated in e.g. pulses per kvarh. You set measurement mode in your test plan to reactive measurement and adjust the scanning heads in front of the reactive diode. All other procedure is the same like active accuracy test. The settings for reactive power is done inside the test bench and reference standard automatically.

  2. which is the standard to be used for testing of for Reactive power in energy meter and what are the acceptable error margins?

    1. The IEC 62053-23 is applicable for static meters for reactive energy (classes 2 and 3). The allowed errors for accuracy are given in the related tables. If you have a meter with reactive class 2, the allowed error is +/-2% for all balanced loads above 0.1 Ib and power-factor 1.

  3. My CLOU (CL710K11) just shows zeros when I try to enquire balance or input new token, I think it is not communicating with the power source

    1. The possible reason could be long communicate distance or the power cable quality,plsase use another socket and try again. if still doesn’t work,pls confirm whether the UIU address is right one( enter 1593570 plus the meter number to set the UIU address).

  4. Where can I find the operational manual for clou meter, with series number CL710K11

    1. Thank you for your message. The operation manual is for the power company or utility. End users get an introduction by the power company and a reference card with the user interface short codes. The configuration for each power company is different. If you are in doubt about a function, ask your power supplier.

    2. My CL710K11 meter
      Red light is lit next to the word “WIRING” and I noticed low power in house today. Any idea what could be the problem.

      1. It indicates a poor communication between the user interface unit and the meter. One reason behind can be a very low supply voltage from the grid.