• March 1, 2024

    How long does a no-load test take?

    CL3000

    When the voltage is applied with no current flowing in the current circuit, the test output of the meter shall not produce more than one pulse.

  • April 28, 2024

    The different current subscripts

    prueba del medidor

    Together with tender documents and meter specifications you will find various subscripts related to current. Now let's look more in detail: Starting current Ist according to IECThe starting current is a fraction of the basic current or nominal current. See the multiplication factors below: IEC 62053-11 direct connected class 1: 0.004 Ibclass 2: 0.005 Ib …

  • November 20, 2023

    When do I need Isolation Current Transformers?

    ICT CL2030 D 300x253 1

    Isolation Current Transformers (ICT) are needed to test more than one direct connected energy meter on a test bench with multiple positions, assuming that the I-P links can not be opened.

  • April 16, 2024

    The Standard Transfer Specification STS

    sts association logo

    The Standard Transfer Specification (STS) has become recognised as the only globally accepted open standard for prepayment systems, ensuring inter-operability between system components from different manufacturers of prepayment systems.