• November 2, 2023

    General information for wiring diagrams

    din 1

    CLOU follows the DIN EN 81346-2 for marking and identification of components inside of automated test equipment.

  • April 4, 2024

    Environmental Conditions For Meter Test

    constante del medidor

    Laboratory meter test equipment should operate under defined climatic conditions.

  • September 22, 2023

    Acceptance tests for energy meters

    r CL710K20

    From time to time there are some questions regarding the acceptance inspection (FAT) for energy meters. This paper is to clarify the legal and metrological matters.

  • September 21, 2023

    The difference between adjustment and calibration

    CL2052

    Calibration means the comparison of a unit under test with test equipment with higher accuracy.

  • March 20, 2024

    Pulse Calculation for Stationary Test Benches

    CL3000

    All energy meters used for billing purpose have a test output for calibration. This can be flashing diode, a pulse output at the terminal or the mark of a rotating disk. This test output gives us information about the power consumption.

  • September 23, 2023

    Terminal wiring for electrical energy meters

    terminal quick connector for Chinese singlephase meter

    In meter- or test bench descriptions you can find various expressions, all with the same meaning.

  • March 1, 2024

    How long does a no-load test take?

    CL3000

    When the voltage is applied with no current flowing in the current circuit, the test output of the meter shall not produce more than one pulse.

  • April 28, 2024

    The different current subscripts

    prueba del medidor

    Together with tender documents and meter specifications you will find various subscripts related to current. Now let's look more in detail: Starting current Ist according to IECThe starting current is a fraction of the basic current or nominal current. See the multiplication factors below: IEC 62053-11 direct connected class 1: 0.004 Ibclass 2: 0.005 Ib …

  • November 20, 2023

    When do I need Isolation Current Transformers?

    ICT CL2030 D 300x253 1

    Isolation Current Transformers (ICT) are needed to test more than one direct connected energy meter on a test bench with multiple positions, assuming that the I-P links can not be opened.

  • April 16, 2024

    The Standard Transfer Specification STS

    sts association logo

    The Standard Transfer Specification (STS) has become recognised as the only globally accepted open standard for prepayment systems, ensuring inter-operability between system components from different manufacturers of prepayment systems.

  • February 10, 2024

    The four-quadrant diagram in electricity metering

    negative phase current

    The interactive diagram shows the relationship between the phase angle φ, apparent-, active- and reactive power respective energy in accordance with clauses 12 and 14 of IEC 60375.

  • November 26, 2023

    Why do I need a Vector Diagram?

    CLOU Portable AC Charging Pile Tester CL6360

    Modern reference standards and calibration devices have usually a graphical function to show the relationship between the voltages and the currents.