Here we are publishing answers on your questions related to electrical energy and metering. If you have questions, please use our contact form or write a comment below the related article. Scan the QR-code to join our WeChat company page.

The calculators and animations in this blog work with JavaScript-enabled Web browsers. Please make sure your Web browser is JavaScript-enabled. Since End of 2020 we are using asynchronous scripting technologies.
Recent Articles
-
Why the Utility Loss Is Going To Be BIG?
There are several factors that are unnecessarily raising utility costs and, as a result, user costs,
-
Smart Meter Protocols for Interoperability
The DLMS/COSEM protocol provides a modern, secure, object oriented interface between meters and systems. In addition it offers an efficient implementation in hardware and software, which makes it ideal for advanced metering applications.
-
What are the Main Challenges for Power Companies?
The traditional coal and gas-based energy production methods are gradually being replaced by renewable sources such as solar, wind and hydroelectricity.
-
Smart Meters in Times of Energy Crises
Due to EU’s sanctions on Russia, all European countries are suffering from a huge rise in energy prices. Mainly impacted are those countries, which are relying on import of oil and gas.
-
Traceability of Meter Test Equipment
All energy meters are calibrated individually at the end of the production line under various load conditions. Each equipment delivers similar test results
-
LED Information of Energy Meters
Various LED information of energy meters is available and described in detail in this article.
-
Power Failure or Short Interruption?
Was it a power failure or a short interruption? Whatever takes longer than 3 minutes is a Power failure. To overcome these definitions, power companies are using the term Outage.
-
Troubleshooting to PLC Communication
CLOU is a member of G3-PLC Alliance. Having G3-PLC certifications ensures that the meter products are compliant to the correct implementation of the G3-PLC standard.
-
Energy Purchase Process for STS Meters
All STS certified meters are recharged in the same principle. For topping-up, a token is used. Tokens can be purchased at the local point of sales (POS).
-
Good to Know ISO Certifications
ISO certification is a mandatory process for international operating companies in terms of quality management system and other requirements.
-
Meter Constant- or Register Test?
The proper energy registration is the essential part for energy meters. Bills are issued according to the register readings.
-
True Benefits of Advanced Metering Infrastructure
The AMI system is providing a number of important functions and informations, which were not previously possible or had to be performed manually.
-
Billing on the DC-side
DC metering will become more important in the near future. Together with energy storage, solar power plants and car charging, the customer expects an accurate billing.
-
The Roles of Electrical Energy Storage
Electricity is consumed at the same time as it is generated. An imbalance between supply and demand will damage the stability and quality of the power supply, even when it does not lead to a blackout.
-
Electrical Energy Storage Glossary
This glossary contains explanation on technical terms together with the CLOU energy storage systems.
-
Happy Chinese New Year 2022
On February 1, 2022, it is the Chinese New Year 2022. This article talks about the origination of the Spring Festival and zodiac animals.
-
High Resistance in the Three-phase Neutral Circuit
We see that the real problem of high resistance in Neutral is the shift of the Neutral point. This can lead to extreme phase-neutral voltage differences.
-
Country-wide Power Generation with Renewables Only
Since purchasing electricity from neighbour countries is more costly than own generation, energy prices are rapidly increasing.
Please what causes the prepared credit to ran fast?
The credit deduction is based on your consumption. If you use less electrical energy, the meter runs slower.
My CL710K11 Single Phase AMR Prepaid Meter is blinking red light at “warning” sign indicator. What does this mean?
Thanks.
If there is no other indication on the display, it means that your credit is getting low.
Thank You! So much for a great blog and best of luck for the future,
I’ll be in touch.
Thank you for your interest. You can swipe down the page bottom and subscribe to our weekly newsletter.
Kindly how can I silence my meter even after dailing 812# still it will revive on its own and starts beeping its really annoying.
The beep can only switch off temporarily for just one minute.
The beep appears because there is an alarm, either low credit, or overload, or tamper.
You can silence your meter permanently after you solve the alarm.
I have a clou meter token and am just wondering how i can silence the beeping alarm that goes off when your are low on tokens. Its kinda annoying. Ypur help will be highly appreciated.
Regards,
Steve
Steve, try code 812 on your UIU (user interface unit) and confirm by pressing the enter-button (blue or red). If it doesn’t work, please tell us the meter model type.
How can someone test reactive energy kvarh in a meter test bench?
If the energy meter has a function for measuring reactive energy, it must have a test output (a flashing diode) indicating the reactive consumption. This test output has a meter constant, indicated in e.g. pulses per kvarh. You set measurement mode in your test plan to reactive measurement and adjust the scanning heads in front of the reactive diode. All other procedure is the same like active accuracy test. The settings for reactive power is done inside the test bench and reference standard automatically.
which is the standard to be used for testing of for Reactive power in energy meter and what are the acceptable error margins?
The IEC 62053-23 is applicable for static meters for reactive energy (classes 2 and 3). The allowed errors for accuracy are given in the related tables. If you have a meter with reactive class 2, the allowed error is +/-2% for all balanced loads above 0.1 Ib and power-factor 1.
My CLOU (CL710K11) just shows zeros when I try to enquire balance or input new token, I think it is not communicating with the power source
The possible reason could be long communicate distance or the power cable quality,plsase use another socket and try again. if still doesn’t work,pls confirm whether the UIU address is right one( enter 1593570 plus the meter number to set the UIU address).
Where can I find the operational manual for clou meter, with series number CL710K11
Thank you for your message. The operation manual is for the power company or utility. End users get an introduction by the power company and a reference card with the user interface short codes. The configuration for each power company is different. If you are in doubt about a function, ask your power supplier.
My CL710K11 meter
Red light is lit next to the word “WIRING” and I noticed low power in house today. Any idea what could be the problem.
It indicates a poor communication between the user interface unit and the meter. One reason behind can be a very low supply voltage from the grid.