CLOU GLOBAL TECHNOLOGY provides energy management products and customized solutions for efficient energy usage, cost reduction, and sustainability compliance.
Here we are publishing answers to your questions related to our products and services.
Please do not hesitate to reach out to us if you have any questions or queries. You can use our easily accessible contact form or can leave a comment below the relevant article to get in touch with us.
Note: The calculators and animations on this website work with JavaScript-enabled Web browsers. Please make sure your Web browser is JavaScript-enabled.
Since End of 2020 we are using asynchronous scripting technologies.
Recent Articles
-
Self-Consumption in the Current Circuit
The IEC 62052-11 has a tiny little detail about the power consumption in the current circuit.
-
The Never-Ending Token Story
Energy meters with prepayment function are mainly working with the Standard Transfer Specification (STS). There are still some manufacturer specific proprietary solutions in the market.
-
The Energy Meter Power Consumption
Power consumption is part of the technical losses. The utilities are bearing these costs. The end-user is not charged.
-
What is the Real Time Clock?
For a real time clock (RTC) CLOU energy meters are operating with an external quartz crystal with a frequency of 32.768 kHz.
-
Ultrasonic Welding for CLOU Meters
CLOU energy meters use ultrasonic welding to ensure its airtightness, and we also talk about the principles, features, conception of the welding.
-
Energy Meters and Batteries
Meters have to work without stop to make data transmission and RTC normal. When power cut off, batteries function as backup power supply.
-
Power Line Communication and Transmission Speed
PLC enables sending data over existing power cables. With just power cables connected to the energy meter, it is possible to read and execute commands.
-
How to Speed Up Your Test Procedures
The sample quantity is internationally not fixed, most countries are taking a random 4% sample, while for example Germany sticks on testing 20%.
-
Poor Meter Connections are Causing Heat
Maintaining the right cross-section avoids overheating and is also reducing the internal resistance.
-
How To Avoid getting A Victim Of Ransomware
A PC virus can be annoying. An encryption virus is a disaster for the whole organization.
-
Taiwan faced widespread rolling blackouts
Taipower said that the outage was caused by a grid failure at the Hsinta Power Plant in the southern city of Kaohsiung.
-
Instrument Transformer Burden Measurement
Instrument transformers are part of the measurement circuit for transformer operated meters.
-
WebSite Metering Results
Since we are metering specialists, we also keep an eye on our website performance. We are running WordPress on a GoDaddy server without any extras.
-
Where is my Smart Meter?
When you deploy new energy meters you want to know the installation position. It's helpful for various purposes
-
Measurement Uncertainties for Test Benches
A test bench consists of several elements which can introduce additional variable errors.
-
The Categories for Electrical Measurements
Sometimes you find in specifications terms like CAT III or CAT IV. These terms are given in IEC 61010-1
-
The Christmas Gimmick 2020
Table Tennis (Pīngpāng qiú 乒乓球) is one of the top National sports in China. As a proof of concept we have remade a very old arcade game.
-
Energy Meters and Hysteresis
You can find this term in a lot of technical documentations with more or less complicated explanations. We'd like to give some simple examples for the need of hysteresis in energy meters.
Thank you for your unwavering commitment to excellence, and for sharing your insights on what it takes to be a world-class energy services provider. Your dedication sets a high standard for the industry. Keep up the fantastic work.
Thank you so much for your kind words and appreciation. I truly appreciate your feedback and support. It is incredibly encouraging to hear that our commitment to excellence and insights in the energy services industry have resonated with you.
Please what causes the prepared credit to ran fast?
The credit deduction is based on your consumption. If you use less electrical energy, the meter runs slower.
My CL710K11 Single Phase AMR Prepaid Meter is blinking red light at "warning" sign indicator. What does this mean?
Thanks.
If there is no other indication on the display, it means that your credit is getting low.
Thank You! So much for a great blog and best of luck for the future,
I'll be in touch.
Thank you for your interest. You can swipe down the page bottom and subscribe to our weekly newsletter.
Kindly how can I silence my meter even after dailing 812# still it will revive on its own and starts beeping its really annoying.
The beep can only switch off temporarily for just one minute.
The beep appears because there is an alarm, either low credit, or overload, or tamper.
You can silence your meter permanently after you solve the alarm.
I have a clou meter token and am just wondering how i can silence the beeping alarm that goes off when your are low on tokens. Its kinda annoying. Ypur help will be highly appreciated.
Regards,
Steve
Steve, try code 812 on your UIU (user interface unit) and confirm by pressing the enter-button (blue or red). If it doesn't work, please tell us the meter model type.
How can someone test reactive energy kvarh in a meter test bench?
If the energy meter has a function for measuring reactive energy, it must have a test output (a flashing diode) indicating the reactive consumption. This test output has a meter constant, indicated in e.g. pulses per kvarh. You set measurement mode in your test plan to reactive measurement and adjust the scanning heads in front of the reactive diode. All other procedure is the same like active accuracy test. The settings for reactive power is done inside the test bench and reference standard automatically.
which is the standard to be used for testing of for Reactive power in energy meter and what are the acceptable error margins?
The IEC 62053-23 is applicable for static meters for reactive energy (classes 2 and 3). The allowed errors for accuracy are given in the related tables. If you have a meter with reactive class 2, the allowed error is +/-2% for all balanced loads above 0.1 Ib and power-factor 1.
My CLOU (CL710K11) just shows zeros when I try to enquire balance or input new token, I think it is not communicating with the power source
The possible reason could be long communicate distance or the power cable quality,plsase use another socket and try again. if still doesn't work,pls confirm whether the UIU address is right one( enter 1593570 plus the meter number to set the UIU address).
Where can I find the operational manual for clou meter, with series number CL710K11
Thank you for your message. The operation manual is for the power company or utility. End users get an introduction by the power company and a reference card with the user interface short codes. The configuration for each power company is different. If you are in doubt about a function, ask your power supplier.
My CL710K11 meter
Red light is lit next to the word "WIRING" and I noticed low power in house today. Any idea what could be the problem.
It indicates a poor communication between the user interface unit and the meter. One reason behind can be a very low supply voltage from the grid.